The simulation environment does not have back offices functionality. This means that historical reports cannot be produced and are thus unavailable. Instead of providing actual historical reports the endpoints on the simulation environment returns mocked data. This makes it possible to still (limited) build and test on the environment before moving to the live environment although these mocked reports does not reflect any actual activity.
More Resources